车规标准AEC-Q200REV-C(3)
For each part qualification, the supplier must present a Certificate of Design, Construction and Qualification data see Appendix 2.
3.2
Qualification of a Lead (Pb) – Free Device
Added requirements needed to address the special quality and reliability issues that arise when lead (Pb) free processing is utilized is specified in Section 4. Materials used in lead-free processing include the termination plating and the board attach (solder). These new materials usually require higher board attach temperatures to yield acceptable solder joint quality and reliability. These higher temperatures will likely adversely affect the moisture sensitivity level of plastic packaged devices. As a result, new, more robust mold compounds may be required. If an encapsulation material change is required to provide adequate robustness for Pb-free processing of the device, the supplier should refer to the process change qualification requirements in this specification. Preconditioning should be run at the applicable reflow temperatures described in Section 4 wherever it is required before environmental stress tests.
车规被动元器件标准!
3.3
3.3.1
Requalification of a Device
Requalification of a device shall be required when the supplier makes a change to the product and/or process that impact the form, fit, function, quality and reliability of the device. Process Change Notification
The supplier shall submit a projection to the users of all forecasted process changes. This projection of implemented changes shall be submitted at least 6 months in advance. Information required for submission to the user will include the following as a minimum: 1. Benefit to the user (value, time and quality).
2. For each user part numbers involved in the change, the following information is required:
a) Supplier part number
b) An estimated date of the last production lot of unchanged parts.
c) An estimated final order date and final ship date of unchanged parts. d) The first projected shipment date and date code of changed parts. A detailed description of the change in terms of the materials, processes,
visual/electrical/mechanical characteristics, rating, circuit design, internal element layout and size as applicable.
4. Technical data and rationale to support the proposed changes.
5. An electrical characterization comparison (between the new and original product) of
all significant electrical parameters over temperature extremes that the change could affect. Changes in median and dispersion performances shall be noted even though conformance to specification limits is still guaranteed.
6. The supplier shall submit an updated Certificate of Design, Construction and Qualification
along with information required by this section (section 3.2.1) plus any changes impacting Appendix 2 information as originally submitted.
7. The results of completed supplier Requalification tests of the changed device(s).
Items 1, 2, 3, & 4 are background information needed up front to evaluate the impact of the change on supply and reliability and to come to agreement on a qualification plan acceptable to the supplier and user. Items 5, 6 and 7 must be submitted prior to any final approval to implement any change on the user's product. No change shall be implemented without prior approval of the users.
3.3.2
Changes Requiring Requalification
As a minimum, any change to the product, as defined in Appendix 1, requires performing the applicable tests listed in Tables 1 and 2-14. Table 2A-14A will be used as a guide for determining which tests need to be performed or whether equivalent generic data can be submitted for that test. These tables include requirements for comparative testing of parts produced before the change to parts produced after. At a minimum, electrical characterization test #19 should be performed on a comparative basis. An agreement between the supplier and the user(s) with justification for performing or not performing any recommended test shall occur before the implementation of a Requalification plan. Criteria for Passing Requalification
It is the responsibility of each user to review the data, change notices, and supporting documentation to either qualify or not qualify the change based on the results of the tests performed. All criteria requirements described in 2.6 apply.
3.3.3
车规被动元器件标准!
3.3.4 User Approval
A change may not affect a part's qualification status, but may affect its performance in an application. Individual user authorization of a process change will be required for that user's particular application(s), and this method of authorization is outside the scope of this document.
4.0 QUALIFICATION TESTS
4.1 General Tests
Test details are given in Tables 1-14. Not all tests apply to all devices. For example, certain tests apply only to hermetically packaged devices, others apply only to SMD large can devices, and so on. The applicable tests for the particular device type are indicated in the "Note" column of Table 1 and the "Additional Requirements" in Tables 2-14. The "Additional Requirements" column of Tables 2-14 also serves to highlight test requirements that supersede those described in the referenced test.
4.2 Device Specific Tests
The following tests must be performed on the specific device to be qualified for all devices. Generic data is not allowed for these tests. Device specific data, if it exists, is acceptable.
1. Electrostatic Discharge (ESD) - All product.
2. Electrical Characterization - The supplier must demonstrate that the part is capable of
meeting parametric limits detailed in the individual user device specification. This data must be taken from at …… 此处隐藏:5838字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [实用文档]李践-有效提升销售的12大黄金法则8-大
- [实用文档]党支部换届工作方案
- [实用文档]2013年下期电子商务专业部宣传工作计划
- [实用文档]方庄一矿通风、钻探绩效工资考核管理办
- [实用文档]项目一 认识企业物流认识企业物流
- [实用文档]MBI_Display_产品蓝图规画
- [实用文档]北京市建筑业劳务作业人员普法维权培训
- [实用文档]锅炉燃烧调整与运行优化
- [实用文档]4支付结算业务的核算
- [实用文档]米什金_货币金融学_第9版各章学习指导
- [实用文档]水泥混凝土路面硬化工程施工组织设计
- [实用文档]钢筋工程安全技术交底书
- [实用文档]关于公布华中师范大学本科毕业论文
- [实用文档]太原市园林绿化施工合同范本 2
- [实用文档]周日辅导 初中英语分类复习单项选择题(
- [实用文档]第四章 文化经纪人的管理形式 第二节
- [实用文档]学宪法讲宪法竞赛题库
- [实用文档]《数值计算方法》期末考试模拟试题二
- [实用文档]爱词霸学英语:每日一句( 十月)
- [实用文档]2014年国家公务员面试:无领导小组讨论
- 新课程主要理念和教学案例分析汇编(24
- 英国人的快乐源于幸福的家庭生活
- 七年级上册第一次月考模拟数学试卷
- 真丝及仿真丝的种类有哪些?
- 【最新】华师大版八年级数学下册第十六
- 高中英语3500个必背单词
- 我可以接受失败,但我不能接受放弃!
- 最近更新沪科版八年级物理上册期末试卷
- 绿化工作先进乡镇事迹材料
- 鲁教版九年级上册思想品德教学计划
- 英语音标的分类
- 地下室底板无梁楼盖与普通梁板结构形式
- 美容师黄金销售话术
- 雅思写作满分作文备考方法
- 血清甲状腺激素测定与高频彩色多普勒超
- 1度浅析装修对室内空气品质的影响
- 2017-2022年中国汞矿行业深度分析与投
- 计算机二级VB公共基础知识
- (何勇)秸秆禁烧_重在寻找出路
- 内外墙抹灰工程分包施工合同1