药厂空调箱发包规范

来源:网络收集 时间:2026-08-22
导读: SPECIFICATION FOR AIR HANDLING UNIT 1. Scope This document is the technical requirements for the recirculation air handling unit; make up air unit; exhaust air fan unit (with functional section) using in the ***** project. 2. Definitions a

SPECIFICATION FOR AIR HANDLING UNIT

1. Scope

This document is the technical requirements for the recirculation air handling unit; make up air unit; exhaust air fan unit (with functional section) using in the ***** project.

2. Definitions and abbreviations

2.1 Definition

AHU – Air handling unit, including recirculation air handling unit, make up air unit, exhaust air fan unit with functional sections.

2.2 Abbreviations

AHU - Air handling unit MAU - Make up air unit EAF - Exhaust air fan unit

AMCA - Air Movement and Control Association International, Inc. FAT - Factory Acceptance Test SAT - Site Acceptance Test

FDA – U.S. Food and Drug Administration VFD – Variable Frequency Drive

GFCI – Ground Fault Circuit Interrupter mm – Millimeter

mm/s – Millimeter per Second m/s – Meter per Second

3. References

ASHRAE: American Society of Heating, Refrigerating & Air Conditioning Engineers, Inc.

Air filters standard GB T 14295-1993

EN 1886: 2006 – Ventilation for buildings Air Handling Unit Mechanical Performance

ASHRAE: American Society of Heating, Refrigerating & Air Conditioning Engineers, Inc.

Code for design of packaged air handling units GB/T14294-1993 ARI 430 - Central-Station Air-Handling Units.

ARI 435 - Application of Central-Station Air-Handling Units. BS 848. parts1 2 &3 - Fans for general purpose. BS 848.2 - Fan Sound Power Levels.

BS 5265; Pt 1 2&3 - Mechanical balancing of rotating bodies.

BS 6339 - Specification for dimensions of circular flanges for general purpose industrial fans.

BS EN 25136 - Acoustics. Determination of sound power radiating into a duct by fans. In duct method. VDI 6022

Any requirements specified in the clauses of this section of the specification shall prevail over any conflicting requirements in these standards.

4. Air handling unit technical requirement空调处理机组技

术要求

4.1 Unit 空调箱

4.1.1 General requirement通用要求

The HVAC cooling media is 6~12℃ chilled water, from black utility system. 暖通空调系统冷源为6~12℃冷冻水,来自公用系统。

The HVAC heating media is 60~50℃ hot water, from black utility system. 暖通空调系统热源为60~50℃热水,来自公用系统。

The HVAC humidifier media is 0.2MPa clean steam, from clean utility system. 暖通空调系统加湿器采用0.2Mpa洁净蒸汽,来自公用系统。 All the inlet and outlet of the AHU should be with manual damper by AHU supplier.

所有空调箱的及出口须由空调箱的供应商提供手动风阀。

For the AHUs which have no coil, the velocity of the section should no more than 2.5m/s.

对于所有无盘管的空调箱,空调箱的断面风速不得大于2.5m/s。

4.2 Unit Casing箱体

4.2.1 All AHUs should have no-through-metal on all wall, floor, doorframe, and ceiling

sections and doors. AHU designated to operate at locations with high temperature and humidity conditions shall have a true thermal break construction. A thermal break should be equivalent to an epoxy bridge. Tape, caulk, paint, gaskets, or similar items are considered unacceptable as a true thermal break.

所有机组需提供由连续的金属制作的墙板,底板,门框和顶板以及门。空调箱须具有满足在高温高湿工况下运行的保温性能。任何位于框架,胶条,填缝,涂层,垫圈或类似的部分发生的热传导将不被接受。

4.2.2 For walls and ceiling, the casing panel skins shall be a minimum 1.0mm thick zinc

coated steel with powder coated on external & inner surfaces.

对于机组侧壁和顶板,箱体板材应为至少1.0毫米后的镀锌钢板,外表面和内表面均要进行粉末喷涂处理。

4.2.3 Floors of units shall be minimum 1.0mm thickness galvanized steel sheet with

colour powder coating on external and inner surfaces, adequately supported to ensure no buckling or deformation takes place as a result of maintenance foot traffic.

机组的底部应为最小1.0毫米厚的镀锌钢板,外表面和内表面均要进行粉末喷涂处理,加固良好以确保无弯曲或变形产生。

4.2.4 The internal surfaces of all sections shall be constructed with stainless steel 304

material. The thickness should be no less than 1mm.

机组所有功能段的内表面采用SS304不锈钢材料制造,不锈钢材料的厚度不得小于1.0毫米。

4.2.5 Insulation shall be continuous at joints and corners to eliminate all paths for cold

tracking. All rivets used in the construction of the casing shall be of the sealed type.

保温应确保在联结和转角处保持连续,以消除冷桥,所有用于外科制作的铆钉应为封闭型。

4.2.6 All the unit casing panels and doors shall be designed to prevent from “cold

bridge”. The insulation shall be PU or rockwool and the performance of all the

panels & doors shall comply with thermal bridging factor of TB2 Class and thermal transmittance performance of T2 Class as per EN1886. TB2:0.6?Kb≤0.75, T2: 0.5?u≤1 w/m2k.

所有的机组面板和门板均应为防冷桥设计。保温材料应为岩棉,所有面板和门板的隔热性能应符合欧洲EN 1886标准所规定的T2标准,防冷桥系数应同时满足该标准中所规定的TB2的要求。(TB2:0.6?Kb≤0.75, T2: 0.5?u≤1 w/m2k) 4.2.7 The unit panels shall be removable with the thickness of no less than 45mm and

shall not cause condensation in operation environment.

机组的面板为可拆卸,其厚度不得小于45毫米,并在运行环境下保证不会引起壁板结露。

4.2.8 Vapour seal all penetrations in the casing due to bolts, pipes, conduits, cables, etc.

with non-setting polyurethane FDA “food grade” sealant. For penetrations larger than 25mm dia., provide insulation sleeves of Polyurethane, sealed to the inside and outside casing of the unit.

使用聚氨酯FDA“食品级”密封剂封闭所有由螺栓、管道、管线等引起的在外壳的穿孔。若穿孔直径大于25毫米,提供聚氨酯的保温套管,封闭机组外壳的内外侧。

4.2.9 The load from equipment shall not be carried by the casing or any of the panels of

the casing. All equipment s …… 此处隐藏:475字,全部文档内容请下载后查看。喜欢就下载吧 ……

药厂空调箱发包规范.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/606673.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)