1 Power Quality Monitoring
Patrick Coleman
Many power quality problems are caused by inadequate wiring or improper grounding. These problems can be detected by simple examination of the wiring and grounding systems. Another large population of power quality problems can be solved by spotchecks of voltage, current, or harmonics using hand held meters. Some problems, however, are intermittent and require longer-term monitoring for solution.
Long-term power quality monitoring is largely a problem of data management. If an RMS value of voltage and current is recorded each electrical cycle, for a three-phase system, about 6 gigabytes of data will be produced each day. Some equipment is disrupted by changes in the voltage waveshape that may not affect the rms value of the waveform. Recording the voltage and current waveforms will result in about 132 gigabytes of data per day. While modern data storage technologies may make it feasible to record every electrical cycle, the task of detecting power quality problems within this mass of data is daunting indeed.
Most commercially available power quality monitoring equipment attempts to reduce the recorded data to manageable levels. Each manufacturer has a generally proprietary data reduction algorithm. It is critical that the user understand the algorithm used in order to properly interpret the results.
1.1 Selecting a Monitoring Point
Power quality monitoring is usually done to either solve an existing power quality problem, or to determine the electrical environment prior to installing new sensitive equipment. For new equipment, it is easy to argue that the monitoring equipment should be installed at the point nearest the point of connection of the new equipment. For power quality problems affecting existing equipment, there is frequently pressure to determine if the problem is being caused by some external source, i.e., the utility. This leads to the installation of monitoring equipment at the service point to try to detect the source of the problem. This is usually not the optimum location for monitoring equipment. Most studies suggest that 80% of power quality problems originate within the facility. A monitor installed on the equipment being affected will detect problems originating within the facility, as well as problems originating on the utility. Each type of event has distinguishing characteristics to assist the engineer in correctly identifying the source of the disturbance.
1.1.1 What to Monitor
At minimum, the input voltage to the affected equipment should be monitored. If the equipment is single phase, the monitored voltage should include at least the line-to-neutral voltage and the neutral to-ground voltages. If possible, the line-to-ground voltage should also be monitored. For three-phase equipment, the voltages may either be monitored line to neutral, or line to line. Line-to-neutral voltages
are easier to understand, but most three-phase equipment operates on line-to-line voltages. Usually, it is preferable to monitor the voltage line to line for three-phase equipment.
If the monitoring equipment has voltage thresholds which can be adjusted, the thresholds should be set to match the sensitive equipment voltage requirements. If the requirements are not known, a good starting point is usually the nominal equipment voltage plus or minus 10%.
In most sensitive equipment, the connection to the source is a rectifier, and the critical voltages are DC. In some cases, it may be necessary to monitor the critical DC voltages. Some commercial power quality monitors are capable of monitoring AC and DC simultaneously, while others are AC only.
It is frequently useful to monitor current as well as voltage. For example, if the problem is being caused by voltage sags, the reaction of the current during the sag can help determine the source of the sag. If the current doubles when the voltage sags 10%, then the cause of the sag is on the load side of the current monitor point. If the current increases or decreases 10–20% during a 10% voltage sag, then the cause of the sag is on the source side of the current monitoring point.
Sensitive equipment can also be affected by other environmental factors such as temperature, humidity, static, harmonics, magnetic fields, radio frequency interference (RFI), and operator error or sabotage. Some commercial monitors can record some of these factors, but it may be necessary to install more than one monitor to cover every possible source of disturbance.
It can also be useful to record power quantity data while searching for power quality problems. For example, the author found a shortcut to the source of a disturbance affecting a wide area by using the power quantity data. The recordings revealed an increase in demand of 2500 KW immediately after the disturbance. Asking a few questions quickly led to a nearby plant with a 2500 KW switched load that was found to be malfunctioning.
1.2 Selecting a Monitor
Commercially available monitors fall into two basic categories: line disturbance analyzers and voltage recorders. The line between the categories is becoming blurred as new models are developed. V oltage recorders are primarily designed to record voltage and current strip chart data, but some models are able to capture waveforms under certain circumstances. Line disturbance analyzers are designed to capture voltage events that may affect sensitive equipment. Generally, line disturbance analyzers are not good voltage recorders, but newer models are better than previous designs at recording voltage strip charts.
In order to select the best monitor for the job, it is necessary to have an idea of the type of disturbance to be recorded, and an idea of the operating characteristics of the available disturbance analyzers. For example, a common power quality problem is nuisance tripping of variable speed drives. Variabl …… 此处隐藏:7495字,全部文档内容请下载后查看。喜欢就下载吧 ……
相关推荐:
- [初中教育]婚姻家庭法学教学教案
- [初中教育]浅谈小学语文教学中的创新教育
- [初中教育]中华人民共和国侵权责任法2009
- [初中教育]2016-2022年中国薄膜太阳能电池行业发
- [初中教育]多级轻型井点降水的应用
- [初中教育]外语教学法流派介绍和简评
- [初中教育]实验一、典型环节及其阶跃响应
- [初中教育]内蒙古2012-2013学年度国家奖学金获奖
- [初中教育]移动通信营销渠道管理探讨
- [初中教育]初三化学第一学期第一第二章基础知识点
- [初中教育]一天的食物教学设计
- [初中教育]光导照明系统的基本结构及工作原理
- [初中教育]长春市十一高、东北师范大学附属中学、
- [初中教育]“十三五”规划重点-配重式装卸车项目
- [初中教育]领导方法和领导艺术
- [初中教育]第三章 植物病虫草鼠害诊断与防治基
- [初中教育]2019届九年级语文上册 第二单元 6纪念
- [初中教育]甲级单位编制水豆腐项目可行性报告(立
- [初中教育]Ch8-1补充 09101数据库系统原理及应用-
- [初中教育]2017-2023年中国吊装设备行业市场分析
- 制作毕业纪念册需要哪些材料
- 2015-2016学年高二化学苏教版选修4课件
- 哈佛管理导师-创建商业案例
- 职场交际中的谈吐礼仪知识与职场会议接
- 中国糕点及面包行业发展现状与竞争战略
- 沂河“12·7”洪水茶山拦河坝
- 管道水流量计算公式
- 4-2发电机火灾事故处置方案
- 数字信号处理实验五
- 2009年经济师(中级)金融专业知识全真试
- 历史街区保护规划--04历史文化遗产保护
- 宁夏回族自治区中小学职称评价标准
- 评先评优测评表
- 圆的切线证明及线段长求解在在中考中的
- 【解析版】2015年江苏省南京外国语学校
- 人教版八年级上册科学第一章习题精华
- 责任心与执行力
- SA8000社会责任管理体系标准培训
- IgA肾病的饮食应注意
- 杭州市建设工程文件归档整理方案(试行)