教学文库网 - 权威文档分享云平台
您的当前位置:首页 > 精品文档 > 法律文档 >

串补隔离开关操作引起二次设备故障分析(3)

来源:网络收集 时间:2026-05-15
导读: arc current and arc gap voltage by operation of isolating series compensation switches is greater respectively than those by operation of isolating no-load bus switches.The similarity between the fre

arc current and arc gap voltage by operation of isolating series compensation switches is greater respectively than those by operation of isolating no-load bus switches.The similarity between the frequency of VFTO and the coupling frequency of the carrier equipment leads to the abnormity and even damage of the carrier equipment by the VFTO coupling from the capacitor voltage transformer.A theoretical analysis model is established for series compensation switches,capacitor voltage transformer and carrier equipment to find out both the coupling path of the VFTO and the cause of the carrier equipment problems.Suggestions are proposed to improve the capacity of MOV for the overvoltage protection and to increase the lead terminals for design,operation and maintenance. Keywords:very fast transient overvoltage;isolating switch;carrier;high frequency cable;voltage transformer;series compensation 中图分类号:TM 文献标志码:A DOI:

10.11930/j.issn.1004-9649.20150167 收稿日期:2017-2-15 作者简介:谭锦鹏(1975—),男,广西梧州人,工程师,从事变电运行维护工作。

E-mail:tanjinpeng@163.com (责任编辑 张子龙)

串补隔离开关操作引起二次设备故障分析(3).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.jiaowen.net/wendang/435104.html(转载请注明文章来源)
Copyright © 2020-2025 教文网 版权所有
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:78024566 邮箱:78024566@qq.com
苏ICP备19068818号-2
Top
× 游客快捷下载通道(下载后可以自由复制和排版)
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
VIP包月下载
特价:29 元/月 原价:99元
低至 0.3 元/份 每月下载150
全站内容免费自由复制
注:下载文档有可能出现无法下载或内容有问题,请联系客服协助您处理。
× 常见问题(客服时间:周一到周五 9:30-18:00)