ABSTRACT
The important issues related to the performance and cost estimation of hard rock Tunnel Boring Machines (TBM) are presented and discussed in this paper. General approaches for performance prediction of TBM, which is one of the most popular mechanical excavators are addressed. Two of the most successful performance prediction models, namely the Colorado School of Mines (CSM) and the Norwegian Institute of Technology (NTH) models and their most recent modifications, improvements, and some recent applications are presented. A comparison is made between the results of both models in two tunneling projects.
1. INTRODUCTION.
TBMs are currently utilized in massive scale in underground construction and tunneling both in civil construction and the mining industry. In the recent years, along with the advancement of the machine manufacturing in many aspects, and rapid advances in technology as a whole, specially information and computer technologies, powerful and somewhat smart machines have been introduced in the market. These machines have generally increased productivity and set new excavation footage records. In spite of all these advancements, there seems to be a lack of complete understanding of the rock cutting process due to the very complex nature of the problem. As a result, not all the
parameters affecting the rock cuttability and hence machine performance in the field are identified and their effects fully explored.
Over the years, several researches have been conducted and models developed for performance prediction of mechanical excavators. In a nut shell, they can be pided into two distinguished approaches. One is based on the cutting forces acting on the inpidual cutters and the other is based on the achieved performance of the machine in the field as a whole system. Each one of these approaches has its own set of advantages and disadvantages, and similarly slightly different area of application.
Table 1. contains some information about the field of application as well as the area of strength and weaknesses of these models. As can be seen, both systems have evolved to a certain level of maturity and reliability, and as will be shown later in this paper. They produce fairly close estimates on machine performance. It must be noted that this paper will be equally applicable to performance prediction of all full face machines.
2. EMPIRICAL PREDICTION METHODS, NTH METHOD
Empirical performance prediction methods are based on the historical field performance of machines in certain rock types. Typically, the models are a set of empirical graphs and equations obtained from the regression analysis between rock properties, ground conditions, machine parameters, and rates of penetration. The main significance of these methods is the fact that they naturally incorporate the effects of the ground and the excavation system as a whole in their entire complexity. This means that all the effects of ground conditions, rock properties, machine parameters, and operational and practical constraints have already been accounted for. The estimates made by these methods are more easily accepted by the operators and, within the realm of current technology, are very reliable. Meanwhile, since these methods rely heavily on the past data, their forecasting capabilities are somewhat limited by the similarity of the old and the new systems. In other words, with the speedy progression of machine technology and capabilities, the predicting ability of these models are limited.
Table 1. Summary of issues related to the two approaches to performance predictions systems. Methodologies Force Empirical
Equilibrium Methods **
Issues Approach* Notes Cutter Forces Yes No
Cutter Geometry (type, shape, etc.) Yes No
Cutting Geometry (spacing & penetration) Yes Partially
Machine Design Issues Yes Partially
Face Layout Yes No
Diagnostics and Design Modifications Yes No
Adaptability and the Ability to Develop Yes Very Limited
New Technologies
Ability to Exchange Information Yes No
Between Different Excavation Systems
Rock Strength and Physical Properties Yes Partially
Rock Property Indices Partially Yes
Ground Conditions Indirect Yes
Rock Mass Properties (joints, faults etc.) Indirect Yes
Performance Prediction Yes Yes
Cutter Cost Estimation Yes Yes
No Some Operator Sensitivity / Judgment
Based on inpidual cutter forces ** Based on Field Performance
Some of the most referenced methods in this group are the NTH or Norwegian method (Listrud 1988, NTH 1995, Bruland et. al. 1995.), Total Hardness method (Tarkoy 1975), and Nelson’s method (Nelson et. al. 1985). Among the above mentioned methods, the NTH method is more widely accepted and used in the industry, specially in the Europe. This method has good merits, proven to be very reliable, and being up dated frequently through the time. The model was originated with the start of the tunnel boring operations in Norway, and was continuously upgraded as more projects were completed.
The NTH model uses a group of rock parameters and indices, which were originally developed for drillability of the hard Nordic rocks. These parameters were later tied into
Table 2. Parameters used by NTH Model.
相关推荐:
- [实用模板]第八章:法国“新浪潮”与“左岸派”
- [实用模板]2021年北京上半年临床医学检验技师生物
- [实用模板]SAP GUI 7.10客户端安装配置文档
- [实用模板]2001年临床执业医师资格考试综合笔试试
- [实用模板]36机场工作实用英语词汇总结
- [实用模板](一)社会保险稽核通知书
- [实用模板]安全教育主题班会材料
- [实用模板]濉溪县春季呼吸道传染病防控应急演练方
- [实用模板]长沙房地产市场周报(1.30-2.3)
- [实用模板]六年级数学上册典中点 - 图文
- [实用模板]C程序设计(红皮书)习题官方参考答案
- [实用模板]中国证监会第一届创业板发行审核委员会
- [实用模板]桥梁工程复习题
- [实用模板]2011学而思数学及答案
- [实用模板]初中病句修改专项练习
- [实用模板]监理学习知识1 - 图文
- [实用模板]小机灵杯四年级试题
- [实用模板]国贸专业毕业论文模板
- [实用模板]教育学概论考试练习题-判断题4
- [实用模板]2015届高考英语一轮复习精品资料(译林
- 00Nkmhe_市场营销学工商管理_电子商务_
- 事业单位考试法律常识
- 诚信教育实施方案
- 吉大小天鹅食品安全检测箱方案(高中低
- 房地产销售培训资料
- 高一地理必修1复习提纲
- 新概念英语第二册lesson_1_练习题
- 证券公司内部培训资料
- 小学英语时间介词专项练习
- 新世纪英语专业综合教程(第二版)第1册U
- 【新课标】浙教版最新2018年八年级数学
- 工程建设管理纲要
- 外研版 必修一Module 4 A Social Surve
- Adobe认证考试 AE复习资料
- 基于H.264AVC与AVS标准的帧内预测技术
- 《食品检验机构资质认定管理办法》(质
- ABB变频器培训课件
- (完整版)小学说明文阅读练习题及答案
- 深思洛克(SenseLock) 深思IV,深思4,深
- 弟子规全文带拼音